CGI Build Schedule: Difference between revisions

From Genecats
Jump to navigationJump to search
(Updating the build schedule.)
(Moving from embedded page to link to calendar.)
Line 1: Line 1:
Go to the CGI Build [[CGI_Build_Process | Process]].
Go to the CGI Build [[CGI_Build_Process | Process]].


<embedurl>https://www.google.com/calendar/b/0/embed?showPrint=0&amp;showTabs=0&amp;showCalendars=0&amp;showTz=0&amp;mode=AGENDA&amp;height=400&amp;wkst=1&amp;bgcolor=%23ffffff&amp;src=ucsc.edu_vaaiq62mh73n78jonljfrnoof4%40group.calendar.google.com&amp;color=%23125A12&amp;ctz=America%2FLos_Angeles</embedurl>
[https://www.google.com/calendar/b/0/embed?showPrint=0&amp;showTabs=0&amp;showCalendars=0&amp;showTz=0&amp;mode=AGENDA&amp;height=400&amp;wkst=1&amp;bgcolor=%23ffffff&amp;src=ucsc.edu_vaaiq62mh73n78jonljfrnoof4%40group.calendar.google.com&amp;color=%23125A12&amp;ctz=America%2FLos_Angeles Link to see the CURRENT Build Calendar]


== Three-week CGI Release Cycle ==
== Three-week CGI Release Cycle ==

Revision as of 22:04, 7 December 2017

Go to the CGI Build Process.

Link to see the CURRENT Build Calendar

Three-week CGI Release Cycle

Monday Tuesday Wednesday Thursday Friday Saturday Sunday
Day 1 (and Day 22)
  • Day 22:
    • Release (final build) to RR
    • CGI Testing on RR
    • Perform build wrap-up steps
  • Day 1:
    • Generate git reports at 10AM (preview build 1)
Day 2
  • Design sharing
  • Pair review
Day 3
  • Pair review
Day 4
  • Implementing
Day 5
  • Implementing
  • Code Reviews Due
Day 6 Day 7
Day 8
  • Major commits by 5pm
  • Generate git reports at 10AM (preview build 2)
Day 9
  • Design sharing
  • Pair review
Day 10
  • Pair review
Day 11
  • Implementing
Day 12
  • Implementing
  • Code Reviews Due
Day 13 Day 14
Day 15
  • Tag, generate git reports, build on hgwbeta at 10AM (final build)
Day 16
  • Pair review
  • Testing
Day 17
  • Pair review
  • Testing
Day 18
  • Patching, testing
Day 19
  • Final testing
  • Code Reviews Due
Day 20 Day 21